DUBLIN INTERNATIONAL AIRPORT

Dublin International Airport

Main Contractor: BAM

Details 

  • High Security JNC Ultra 358

    High Security Double leaf Swing Gates

 

Details

Installation of 3.30 kilometres of the highest specification JNC Ultra 358 complete with full clamp bars, upper and lower support angles all fully strapped with high security fixings to Y posts with a barbed wire topping as well as numerous gates. 

Project Photos 

s2
s1
s3
s4

Featured Projects